Replacement of the drying unit, increasing the storage capacity of the existing silo plant
VECTOR OIL LLC 2015, 2017.
Location: with. Penkovka, Shargorodsky district, Vinnytsia region, Ukraine
Complex of works:
2014 - Development of project documentation. General contract works for construction. Supply of equipment - grain dryers LAW SBC 22 LE - 2500. Construction and installation, commissioning.
Terms of the project: March - June 2014
2015 - Reconstruction of the silo complex for 13 thousand tons for receiving, cleaning, drying and storage of grain. Supply and installation of AGI equipment (3 silos at 5 658m3, bucket elevators and conveyors AGI and Tramco chain conveyors), fabrication and installation of metal structures, installation of a car unloading station, engineering networks. Landscaping. General contract works.
2017
Complex of works: Replacement of the technological equipment of the existing elevator complex with a more efficient one: design works, delivery of transport equipment. General contract for construction
Terms of the project: April - September 2017
Project implementation period: 2014-2017